Type | Name | Uploaded | Amended | Comments | Status |
---|---|---|---|---|---|
BP_SO_13.3 Interim Real Time NTC Reduction | 03/04/2019 | 03/04/2019 | |||
BP_SO_13.1 Interim Long-Term Coordinated Capacity Calculation | 03/04/2019 | 03/04/2019 | |||
BP_SO_11.2 Cross Border Balancing Trading | 03/04/2019 | 03/04/2019 | |||
BP_SO_10.1 Perform Long-Term and Short-Term Scheduling | 03/04/2019 | 03/04/2019 | |||
BP_SO_03.4 Dispatch Wind Units via EMS | 03/04/2019 | 03/04/2019 | |||
BP_SO_03.2_Issue_Dispatch_Instructions.pdf | 03/04/2019 | 03/04/2019 | |||
BP_SO_03.1 Manage Events Impacting Scheduling and Dispatch | 03/04/2019 | 03/04/2019 | |||
BP_SO_02.2 System Constraints Calculation | 03/04/2019 | 03/04/2019 | |||
Market Operator User Group Presentation 03/04/2019 | 03/04/2019 | 03/04/2019 | |||
Week 14 2019 Weekly Operational Constraints Update | 01/04/2019 | 01/04/2019 |