Terms of Reference for 2020/21 Scheduling and Dispatch Process Audits
Affected Period
Status
Closed
Category
Run Type
Created
Last Updated
Note issued on behalf of the Transmission System Operators
In compliance with Paragraph 9 of Condition 10A and Condition 22A of their respective Transmission System Operator Licences, EirGrid and SONI are required to undertake a periodic audit of the operation and implementation of the Scheduling and Dispatch process.
The Transmission System Operators recently published the Terms of Reference for the audits of the 2020 and 2021 calendar years.
This publication follows a consultation on the proposed scope. Responses to the consultation are summarised in the terms of reference document and are published in full on the EirGrid and SONI libraries.
EirGrid and SONI would like to thank respondents
for their representations.